Permit: TC-RES-0126-00063
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
630 N MANN CI
Address NEW:
630 N MANN CI
Apply Date:
01/06/2026
Applicant:
ramon osorio
Description:
Convert Storage Room into Bathroom
Permit Reviews
Permit Number - TC-RES-0126-00063
Permit Status: Inspections
Permit Description: Convert Storage Room into Bathroom
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/09/2026 | RESIDENTIAL ADD/ALT v.1 | 01/27/2026 | REQUIRES RESUBMIT |
| 02/09/2026 | RESIDENTIAL ADD/ALT v.2 | 02/09/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0126-00063
Permit Status: Inspections
Permit Description: Convert Storage Room into Bathroom
| Date | Description | Comments |
|---|---|---|
| 01/09/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0126-00063
Permite Description: Convert Storage Room into Bathroom
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | COT - RSPL - Rough Soil | N/A | Partial Pass | all except tie in |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0126-00063
Permit Description: Convert Storage Room into Bathroom
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |