Permit: TC-RES-0125-00610
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2008 W ROMANY RD
Address NEW:
2008 W ROMANY RD
Apply Date:
01/31/2025
Applicant:
Hailey McGraw
Description:
Rooftop Solar System 18 Modules 7.470KW Tesla Powerwall/1 Battery @ 11.5KW
Permit Reviews
Permit Number - TC-RES-0125-00610
Permit Status: Complete
Permit Description: Rooftop Solar System
18 Modules
7.470KW
Tesla Powerwall/1 Battery @ 11.5KW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/02/2025 | RESIDENTIAL SOLAR v.1 | 03/04/2025 | APPROVED |
| 04/03/2025 | RESIDENTIAL SOLAR REVISION v.1 | 04/30/2025 | APPROVED |
| 06/09/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/01/2025 | APPROVED |
| 03/05/2025 | RESIDENTIAL SOLAR REVISION v.1 | 04/02/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0125-00610
Permit Status: Complete
Permit Description: Rooftop Solar System
18 Modules
7.470KW
Tesla Powerwall/1 Battery @ 11.5KW
| Date | Description | Comments |
|---|---|---|
| 03/04/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 03/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00610
Permit Description: Rooftop Solar System
18 Modules
7.470KW
Tesla Powerwall/1 Battery @ 11.5KW
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/16/2025 | BULD - Electrical Clearance | Passed | Approved solar and battery with 175A derate - DGC/BAT Clearance to TEP is required for the solar meter | |
| 07/16/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 07/16/2025 | RSBU - Building Final | Passed |