Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1730 E KLEINDALE RD
Apply Date:
01/31/2025
Applicant:
Noe Quijada
Description:
Roof-mounted PV solar installation, 31 modules, 13.95kW DC, 11.5kW AC, with energy storage, with Tesla Backup Switch.

Permit Reviews

Permit Number - TC-RES-0125-00609
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, 31 modules, 13.95kW DC, 11.5kW AC, with energy storage, with Tesla Backup Switch.
Start Date Submittal Complete Date Status  
02/02/2025 RESIDENTIAL SOLAR v.1 03/04/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0125-00609
Permit Status: Complete
Permit Description: Roof-mounted PV solar installation, 31 modules, 13.95kW DC, 11.5kW AC, with energy storage, with Tesla Backup Switch.
Date Description Comments
03/03/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00609
Permite Description: Roof-mounted PV solar installation, 31 modules, 13.95kW DC, 11.5kW AC, with energy storage, with Tesla Backup Switch.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/09/2025 BULD - Electrical Clearance N/A Partial Pass Partial for the Tesla meter adapter- DGL Clearance was called into TEP
Pending solar

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00609
Permit Description: Roof-mounted PV solar installation, 31 modules, 13.95kW DC, 11.5kW AC, with energy storage, with Tesla Backup Switch.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/18/2025 COT - RSOL - Electrical Final Solar Project Passed
06/18/2025 RSBU - Building Final Passed
06/18/2025 BULD - Electrical Clearance Passed Approved solar with battery - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-LYNNDEYOUNG_V1_01292025_STAMPED679A662D838EE_V1.PDF DOCUMENTS VIEW
LYNNDEYOUNG_CALCS_STAMPED679A6619239FF_V1.PDF DOCUMENTS VIEW