Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
01/27/2025
Applicant:
Gregory Chaisson
Description:
Remove existing 200 amp service, install 200 amp meter can and 200 amp main breaker nema 3r siemans loadcenter 40/40, and drive 2 grounding rods. Bond the water line there is No gas at this residence. Ground the new 200 amp service, and install all new breakers.

Permit Reviews

Permit Number - TC-RES-0125-00494
Permit Status: Complete
Permit Description: Remove existing 200 amp service, install 200 amp meter can and 200 amp main breaker nema 3r siemans loadcenter 40/40, and drive 2 grounding rods. Bond the water line there is No gas at this residence. Ground the new 200 amp service, and install all new breakers.
Start Date Submittal Complete Date Status  
01/27/2025 RESIDENTIAL SIMPLE REVIEW v.1 01/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0125-00494
Permit Status: Complete
Permit Description: Remove existing 200 amp service, install 200 amp meter can and 200 amp main breaker nema 3r siemans loadcenter 40/40, and drive 2 grounding rods. Bond the water line there is No gas at this residence. Ground the new 200 amp service, and install all new breakers.
Date Description Comments
01/27/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00494
Permit Description: Remove existing 200 amp service, install 200 amp meter can and 200 amp main breaker nema 3r siemans loadcenter 40/40, and drive 2 grounding rods. Bond the water line there is No gas at this residence. Ground the new 200 amp service, and install all new breakers.
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/26/2025 BULD - Electrical Clearance Passed Approved 200A service panel upgrade - INCR Clearance was called into TEP at 12:20pm
02/26/2025 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SCOTT DRAWING_V1.PDF DOCUMENTS VIEW