Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
5534 S CANADA DR
Address NEW:
5534 S CANADA DR
Apply Date:
01/22/2025
Applicant:
Marytine Ramos
Description:
Installation of Roof mounted 6.15kW PV System / 225A MPU

Permit Reviews

Permit Number - TC-RES-0125-00403
Permit Status: Issued
Permit Description: Installation of Roof mounted 6.15kW PV System / 225A MPU
Start Date Submittal Complete Date Status  
05/06/2025 RESIDENTIAL SOLAR REVISION v.1 05/27/2025 APPROVED Review Details
01/23/2025 RESIDENTIAL SOLAR v.1 02/24/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0125-00403
Permit Status: Issued
Permit Description: Installation of Roof mounted 6.15kW PV System / 225A MPU
Date Description Comments
02/24/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0125-00403
Permite Description: Installation of Roof mounted 6.15kW PV System / 225A MPU
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/10/2025 BULD - Electrical Clearance N/A Partial Pass

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0125-00403
Permit Description: Installation of Roof mounted 6.15kW PV System / 225A MPU
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/01/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
06/11/2025 RSBU - Building Final Passed
06/11/2025 COT - RSOL - Electrical Final Solar Project Passed
06/11/2025 BULD - Electrical Clearance Passed Approved solar - DGCClearance to TEP is required

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-OUR69230-JOHN F_CAD 2_STAMPED_V1.PDF DOCUMENTS VIEW
REVISION LETTER -JOHN OTT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-OUR69230-OTT_CAD 1_STAMPED_V1.PDF DOCUMENTS VIEW
PE CALCS_JOHN OTT RESIDENCE_V1.PDF DOCUMENTS VIEW