Permit: TC-RES-0125-00362
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
146 N WHITE WILLOW PL
Address NEW:
146 N WHITE WILLOW PL
Apply Date:
01/21/2025
Applicant:
Hailey McGaw
Description:
(18) NEW HYPERION; HY_DH108P8B_405 - 405W MODULES (18) NEW MICRO-INVERTERS; ENPHASE; IQ8MC-72-2-US (1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY MONITORING SYSTEM (1) NEW UTILITY DG DISCONNECT (1) NEW DG METER (1) NEW 30AMP PHOTOVOLTAIC BREAKER (30) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH INTEGRATED GROUND BONDING
Permit Reviews
Permit Number - TC-RES-0125-00362
Permit Status: Complete
Permit Description: (18) NEW HYPERION; HY_DH108P8B_405 - 405W MODULES
(18) NEW MICRO-INVERTERS; ENPHASE; IQ8MC-72-2-US
(1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY
MONITORING SYSTEM
(1) NEW UTILITY DG DISCONNECT
(1) NEW DG METER
(1) NEW 30AMP PHOTOVOLTAIC BREAKER
(30) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH
INTEGRATED GROUND BONDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/22/2025 | RESIDENTIAL SOLAR v.1 | 02/20/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00362
Permit Description: (18) NEW HYPERION; HY_DH108P8B_405 - 405W MODULES
(18) NEW MICRO-INVERTERS; ENPHASE; IQ8MC-72-2-US
(1) NEW PV AC COMBINER PANEL WITH ENPHASE ENVOY
MONITORING SYSTEM
(1) NEW UTILITY DG DISCONNECT
(1) NEW DG METER
(1) NEW 30AMP PHOTOVOLTAIC BREAKER
(30) NEW PHOTOVOLTAIC ROOF MOUNTING HARDWARE WITH
INTEGRATED GROUND BONDING
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | BULD - Electrical Clearance | Passed | Approved solar - DGC Clearance to TEP is required for the solar meter | |
| 02/28/2025 | RSBU - Building Final | Passed | ||
| 02/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed |