Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
01/16/2025
Applicant:
ABACUS PLUMBING CO
Description:
RE-PIPE EXISTING HOT AND COLD WATERLINE TO ALL FIXTURES WITHIN THE HOUSE. NEW PIPING WILL BE UP IN THE ATTIC AND WALLS OF THE HOUSE

Permit Reviews

Permit Number - TC-RES-0125-00293
Permit Status: Inspections complete
Permit Description: RE-PIPE EXISTING HOT AND COLD WATERLINE TO ALL FIXTURES WITHIN THE HOUSE. NEW PIPING WILL BE UP IN THE ATTIC AND WALLS OF THE HOUSE
Start Date Submittal Complete Date Status  
01/17/2025 RESIDENTIAL SIMPLE REVIEW v.1 01/17/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0125-00293
Permit Status: Inspections complete
Permit Description: RE-PIPE EXISTING HOT AND COLD WATERLINE TO ALL FIXTURES WITHIN THE HOUSE. NEW PIPING WILL BE UP IN THE ATTIC AND WALLS OF THE HOUSE
Date Description Comments
01/17/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
01/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0125-00293
Permit Description: RE-PIPE EXISTING HOT AND COLD WATERLINE TO ALL FIXTURES WITHIN THE HOUSE. NEW PIPING WILL BE UP IN THE ATTIC AND WALLS OF THE HOUSE
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/04/2025 RSPL - Plumbing Progress Passed New plumbing connections per code, insulation present on hot water side, 2/4/25
02/04/2025 COT - RSPL - Plumbing Final Passed New plumbing connections per code, insulation present on hot water side, 2/4/25

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
8873 E POMERGRANTE HOT - COLD REPIPE TEMPLATE_V1.PDF DOCUMENTS VIEW