Permit: TC-RES-0125-00278
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2309 E 3RD ST
Address NEW:
2309 E 3RD ST
Apply Date:
01/16/2025
Applicant:
TFS Solar
Description:
Roof mount 5.16 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. NEMA 14-50 EV charger outlet installed in existing 125A Subpanel.
Permit Reviews
Permit Number - TC-RES-0125-00278
Permit Status: Complete
Permit Description: Roof mount 5.16 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. NEMA 14-50 EV charger outlet installed in existing 125A Subpanel.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/16/2025 | RESIDENTIAL SOLAR v.1 | 02/15/2025 | APPROVED |
| 02/21/2025 | RESIDENTIAL SOLAR REVISION v.1 | 03/26/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0125-00278
Permit Status: Complete
Permit Description: Roof mount 5.16 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. NEMA 14-50 EV charger outlet installed in existing 125A Subpanel.
| Date | Description | Comments |
|---|---|---|
| 03/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00278
Permit Description: Roof mount 5.16 kW DC photovoltaic solar system; 12 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup. NEMA 14-50 EV charger outlet installed in existing 125A Subpanel.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | BULD - Electrical Clearance | Passed | Approved solar with powerwall 3 - DGC/DGL/BAT Clearance to TEP is required for the solar meter | |
| 04/29/2025 | RSBU - Building Final | Passed | ||
| 04/29/2025 | COT - RSOL - Electrical Final Solar Project | Passed |