Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
429 W 21ST ST UNIT 2
Apply Date:
01/14/2025
Applicant:
Dan Noyce
Description:
Fire Restoration Unit #2

Permit Reviews

Permit Number - TC-RES-0125-00218
Permit Status: Complete
Permit Description: Fire Restoration Unit #2
Start Date Submittal Complete Date Status  
01/28/2025 RESIDENTIAL NEW DWELLING v.1 01/28/2025 REQUIRES RESUBMIT Review Details
02/05/2025 RESIDENTIAL NEW DWELLING v.2 03/11/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0125-00218
Permit Status: Complete
Permit Description: Fire Restoration Unit #2
Date Description Comments
01/28/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00218
Permit Description: Fire Restoration Unit #2
Total Completed Inspections - 8
Date Description Inspector Results Comments
04/07/2025 BULD - Electrical Clearance Passed TEP Clearance: RECN
05/12/2025 COT - RSBU - Roof Nailing Passed 5-12-25, roof nailing & framing verified per plans. Okay to dry-in roof and section of sheathing along roof decking.
05/14/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed Ok to insulate and sheet rock.
06/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/08/2025 COT - RSPL - Plumbing Final Passed
08/11/2025 COT - RSEL - Electrical Final Passed 8.11.2025
Corrections made.
08/11/2025 COT - RSME - Mechanical Final Passed 8.11.2025
Corrections made.
08/11/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-DRAWING SET_V1ORIGIN_V1.PDF DOCUMENTS VIEW
MANUAL JS_V1ORIGIN_V1.PDF DOCUMENTS VIEW