Permit: TC-RES-0125-00084
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
838 S 2ND AV
Address NEW:
838 S 2ND AV
Apply Date:
01/07/2025
Applicant:
TFS Solar
Description:
Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0125-00084
Permit Status: Inspections
Permit Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2025 | RESIDENTIAL SOLAR v.1 | 02/07/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0125-00084
Permite Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 9/2/25 TEP CLEARANCE: DGL, called TEP @ 10:30 partial pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0125-00084
Permit Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2025 | BULD - Electrical Clearance | Passed | 12.03.2025 Clearance to TEP DGC/BAT. |
|
| 12/03/2025 | RSBU - Building Final | Passed | ||
| 12/03/2025 | COT - RSOL - Electrical Final Solar Project | Passed |