Description:
Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0125-00084
Permit Status: Inspections
Permit Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
01/07/2025 RESIDENTIAL SOLAR v.1 02/07/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-RES-0125-00084
Permite Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/02/2025 BULD - Electrical Clearance N/A Partial Pass 9/2/25
TEP CLEARANCE: DGL, called TEP @ 10:30 partial pass

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0125-00084
Permit Description: Roof mount 8.17kW DC photovoltaic solar system; 19 modules; 13.5 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings. Trench between garage and residence to battery. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/03/2025 BULD - Electrical Clearance Passed 12.03.2025
Clearance to TEP DGC/BAT.
12/03/2025 RSBU - Building Final Passed
12/03/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BUCHANAN ALLISON PV2 8.17 KW STORAGE 13.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW
CONS-BUCHANAN ALLISON PV2 8.17 KW STORAGE 13.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW