Permit: TC-RES-0125-00058
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1725 N JUSTIN LN
Address NEW:
1725 N JUSTIN LN
Apply Date:
01/06/2025
Applicant:
TFS Solar
Description:
Roof mount 3.01kW DC photovoltaic solar system; 7 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0125-00058
Permit Status: Complete
Permit Description: Roof mount 3.01kW DC photovoltaic solar system; 7 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2025 | RESIDENTIAL SOLAR v.1 | 02/05/2025 | REQUIRES RESUBMIT |
| 04/09/2025 | RESIDENTIAL SOLAR v.2 | 04/22/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0125-00058
Permit Status: Complete
Permit Description: Roof mount 3.01kW DC photovoltaic solar system; 7 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 04/22/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00058
Permit Description: Roof mount 3.01kW DC photovoltaic solar system; 7 modules with microinverters, 1 branch, 20A PV breaker on 200A bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | BULD - Electrical Clearance | Passed | 05/06/25 TEP CLEARANCE: DGC |
|
| 05/06/2025 | RSBU - Building Final | Passed | ||
| 05/06/2025 | COT - RSOL - Electrical Final Solar Project | Passed |