Permit: TC-RES-0125-00057
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
638 S MORDASINI PL
Address NEW:
638 S MORDASINI PL
Apply Date:
01/06/2025
Applicant:
TFS Solar
Description:
13.5 kWh storage system (1 battery) connected to existing photovoltaic solar system. Interconnection via PCS on main service. Tesla backup switch for whole home backup. 200A Bus with 200A MCB.
Permit Reviews
Permit Number - TC-RES-0125-00057
Permit Status: Complete
Permit Description: 13.5 kWh storage system (1 battery) connected to existing photovoltaic solar system. Interconnection via PCS on main service. Tesla backup switch for whole home backup. 200A Bus with 200A MCB.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2025 | RESIDENTIAL SOLAR v.2 | 02/18/2025 | APPROVED |
| 01/07/2025 | RESIDENTIAL SOLAR v.1 | 01/07/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0125-00057
Permit Status: Complete
Permit Description: 13.5 kWh storage system (1 battery) connected to existing photovoltaic solar system. Interconnection via PCS on main service. Tesla backup switch for whole home backup. 200A Bus with 200A MCB.
| Date | Description | Comments |
|---|---|---|
| 02/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0125-00057
Permit Description: 13.5 kWh storage system (1 battery) connected to existing photovoltaic solar system. Interconnection via PCS on main service. Tesla backup switch for whole home backup. 200A Bus with 200A MCB.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 04/21/2025 | RSBU - Building Final | Passed | ||
| 04/21/2025 | BULD - Electrical Clearance | Passed | Approved solar battery - BAT Clearance to TEP is required |