Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
1001 N 3RD AV UNIT 2
Apply Date:
01/06/2025
Applicant:
TFS Solar
Description:
Roof mount 6.45kW DC photovoltaic solar system; 15 modules, Tesla Solar Inverter with 2 strings, Meter Socket Adapter Interconnection with integrated 60A breaker. 200A multi-meter with 200A MCB. Interior 200A load center with exterior 200A MCB on multi-meter.

Permit Reviews

Permit Number - TC-RES-0125-00049
Permit Status: Complete
Permit Description: Roof mount 6.45kW DC photovoltaic solar system; 15 modules, Tesla Solar Inverter with 2 strings, Meter Socket Adapter Interconnection with integrated 60A breaker. 200A multi-meter with 200A MCB. Interior 200A load center with exterior 200A MCB on multi-meter.
Start Date Submittal Complete Date Status  
02/24/2025 RESIDENTIAL SOLAR v.2 03/24/2025 APPROVED Review Details
01/06/2025 RESIDENTIAL SOLAR v.1 02/04/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0125-00049
Permit Status: Complete
Permit Description: Roof mount 6.45kW DC photovoltaic solar system; 15 modules, Tesla Solar Inverter with 2 strings, Meter Socket Adapter Interconnection with integrated 60A breaker. 200A multi-meter with 200A MCB. Interior 200A load center with exterior 200A MCB on multi-meter.
Date Description Comments
01/16/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0125-00049
Permit Description: Roof mount 6.45kW DC photovoltaic solar system; 15 modules, Tesla Solar Inverter with 2 strings, Meter Socket Adapter Interconnection with integrated 60A breaker. 200A multi-meter with 200A MCB. Interior 200A load center with exterior 200A MCB on multi-meter.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/10/2025 BULD - Electrical Clearance Passed
04/10/2025 COT - RSOL - Electrical Final Solar Project Passed
04/10/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
OSBORNE VALERIE FUP RFC_V1.PDF DOCUMENTS VIEW