Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0124-00538
Permit Details
Apply Date:
01/30/2024
Applicant:
David Muniz
Description:
Main Service upgrade 200 AMP-120/240V All in one Panel, Existing service location to remain. Remove existing knob and tube 2-wire system, & Install new 3-wire grounded branch circuits. (New Switches, Tamper resistance Outlets, & GFCI Devices)
Permit Reviews
Permit Number - TC-RES-0124-00538
Permit Status: Issued
Permit Description: Main Service upgrade 200 AMP-120/240V All in one Panel, Existing service location to remain. Remove existing knob and tube 2-wire system, & Install new 3-wire grounded branch circuits. (New Switches, Tamper resistance Outlets, & GFCI Devices)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/30/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 01/30/2024 | REQUIRES RESUBMIT |
02/08/2024 | RESIDENTIAL SIMPLE REVIEW v.3 | 02/08/2024 | APPROVED |
02/06/2024 | RESIDENTIAL SIMPLE REVIEW v.2 | 02/06/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0124-00538
Permit Description: Main Service upgrade 200 AMP-120/240V All in one Panel, Existing service location to remain. Remove existing knob and tube 2-wire system, & Install new 3-wire grounded branch circuits. (New Switches, Tamper resistance Outlets, & GFCI Devices)
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2024 | BULD - Electrical Clearance | Passed | PASSED INCR Clearance called to TEP at 2. | |
03/26/2024 | RSEL - Electrical Progress | Passed | 3/26/24: electrical intermediate passed. Ok to proceed. | |
03/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/26/24: electrical intermediate passed. Ok to proceed. | |
04/12/2024 | COT - RSEL - Electrical Final | Passed | Approved and complete | |
04/12/2024 | RSBU - Building Final | Passed | Approved and complete |