Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
4434 E 31ST ST
Address NEW:
4434 E 31ST ST
Apply Date:
01/30/2024
Applicant:
Rich Coyle
Description:
Will install new appropriately sized steel pipe from the new meter location to the 3 fixtures (Range, Furnace, Water Heater). We will run the pipe up the wall across the roof. We will install a tee to supply the water heater and the furnace. Will run new pipe across the roof to the range location. We will seal and secure all roof penetrations. All pipes will be properly strapped and secured as required by code. Gas line will be bonded to the cold-water line. We will place gas line on 15lb pressure test and schedule inspection.

Permit Reviews

Permit Number - TC-RES-0124-00535
Permit Status: Issued
Permit Description: Will install new appropriately sized steel pipe from the new meter location to the 3 fixtures (Range, Furnace, Water Heater). We will run the pipe up the wall across the roof. We will install a tee to supply the water heater and the furnace. Will run new pipe across the roof to the range location. We will seal and secure all roof penetrations. All pipes will be properly strapped and secured as required by code. Gas line will be bonded to the cold-water line. We will place gas line on 15lb pressure test and schedule inspection.
Start Date Submittal Complete Date Status  
01/30/2024 RESIDENTIAL SIMPLE REVIEW v.1 01/30/2024 APPROVED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0124-00535
Permit Description: Will install new appropriately sized steel pipe from the new meter location to the 3 fixtures (Range, Furnace, Water Heater). We will run the pipe up the wall across the roof. We will install a tee to supply the water heater and the furnace. Will run new pipe across the roof to the range location. We will seal and secure all roof penetrations. All pipes will be properly strapped and secured as required by code. Gas line will be bonded to the cold-water line. We will place gas line on 15lb pressure test and schedule inspection.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/16/2024 COT - RSPL - Plumbing Final Passed
02/16/2024 RSPL - Plumbing Progress Passed
02/16/2024 COT - BULD - SWG Clearance Passed
02/16/2024 COT - LCPL - Gas Pressure Test Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MAP E 31ST_V1.PDF DOCUMENTS VIEW