Permit: TC-RES-0124-00500
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7530 E MARY DR
Address NEW:
7530 E MARY DR
Apply Date:
01/29/2024
Applicant:
James Watson
Description:
CE-VIO1122-00716 Fire Damage Repair & Addition
Permit Reviews
Permit Number - TC-RES-0124-00500
Permit Status: Complete
Permit Description: CE-VIO1122-00716 Fire Damage Repair & Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/30/2024 | APPROVED |
| 01/29/2024 | RESIDENTIAL NEW DWELLING v.1 | 02/16/2024 | APPROVED |
| 06/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0124-00500
Permit Status: Complete
Permit Description: CE-VIO1122-00716 Fire Damage Repair & Addition
| Date | Description | Comments |
|---|---|---|
| 02/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0124-00500
Permite Description: CE-VIO1122-00716 Fire Damage Repair & Addition
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2024 | BULD - Electrical Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0124-00500
Permit Description: CE-VIO1122-00716 Fire Damage Repair & Addition
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footings are properly dug, rebar reinforcement is in place and supported off of ground, forms are set, and exterminating has been completed. Okay to pour concrete for footings and slab on grade. | |
| 05/13/2024 | COT - RSBU - Preslab | Passed | Footings are properly dug, rebar reinforcement is in place and supported off of ground, forms are set, and exterminating has been completed. Okay to pour concrete for footings and slab on grade. | |
| 06/10/2024 | COT - RSBU - Roof Nailing | Passed | Roof joists are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly nailed off | |
| 06/10/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Roof joists are properly secured to top plate with nails and H2.5 clips. Plywood sheathing is properly nailed off. Exterior shear wall sheathing is properly nailed to studs. Okay to proceed with installation of insulation and drywall. | |
| 07/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/20/2024 | RSBU - Building Final | Passed | ||
| 09/20/2024 | COT - RSEL - Electrical Final | Passed | ||
| 09/20/2024 | COT - RSME - Mechanical Final | Passed | ||
| 09/20/2024 | COT - RSPL - Plumbing Final | Passed |