Permit: TC-RES-0124-00445
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1311 S OSBORNE AV
Address NEW:
1311 S OSBORNE AV
Apply Date:
01/25/2024
Applicant:
Jose Quintero
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0124-00445
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/10/2025 | APPROVED |
| 01/26/2024 | RESIDENTIAL NEW DWELLING v.1 | 02/16/2024 | REQUIRES RESUBMIT |
| 04/25/2024 | RESIDENTIAL NEW DWELLING v.2 | 05/23/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0124-00445
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 01/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 01/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0124-00445
Permit Description: SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2024 | COT - RSPL - Rough Soil | Passed | Ok to cover progress areas. | |
| 07/18/2024 | COT - RSBU - Preslab | Passed | 7/18/24: reinforcement per plan ok to proceed | |
| 07/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 7/18/24: reinforcement per plan ok to proceed | |
| 09/23/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 09/23/2024 | COT - RSBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
| 09/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and cover interior walls. | |
| 10/02/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/2/2024 | |
| 11/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/29/2024 | COT - RSPL - Sewer | Passed | Approved. Duplicate inspection. 11/29/2024 | |
| 11/29/2024 | COT - RSPL - Yard Water Line | Passed | Approved. Duplicate inspection. 11/29/2024 | |
| 11/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/02/2024 | RSBU - Building Final | Passed | ||
| 12/02/2024 | COT - RSEL - Electrical Final | Passed | ||
| 12/02/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/02/2024 | COT - RSME - Mechanical Final | Passed | ||
| 12/02/2024 | COT - RSPL - Plumbing Final | Passed |