Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2018 W PROBASCO DR
Apply Date:
01/13/2024
Applicant:
Dora Godinez
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0124-00221
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
02/07/2024 RESIDENTIAL NEW DWELLING v.2 02/08/2024 APPROVED Review Details
04/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/08/2024 APPROVED Review Details
01/17/2024 RESIDENTIAL NEW DWELLING v.1 02/01/2024 REQUIRES RESUBMIT Review Details
02/08/2024 RESTAMP - RESIDENTIAL v.1 02/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-RES-0124-00221
Permit Status: Complete
Permit Description: SFR
Date Description Comments
03/07/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0124-00221
Permite Description: SFR
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/13/2024 COT - RSPL - Rough Soil N/A Partial Pass site sewer is not complete from approximately 10’ from slab to HCS

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0124-00221
Permit Description: SFR
Total Completed Inspections - 18
Date Description Inspector Results Comments
03/19/2024 COT - RSEL - Grounding/Bonding Passed
03/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/19/2024 COT - RSBU - Preslab Passed
04/04/2024 COT - RSBU - Roof Nailing Passed
04/08/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/17/2024 COT - RSPL - Rough Soil Passed
04/18/2024 BULD - Electrical Clearance Passed
04/18/2024 COT - RSPL - Gas Pressure Test Passed
04/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/24/2024 COT - BULD - SWG Clearance Passed 5/24/24: SWG clearance meter tag
05/24/2024 COT - RSEL - Electrical Underground Passed
05/24/2024 COT - RSPL - Yard Water Line Passed
05/24/2024 COT - RSPL - Sewer Passed
05/24/2024 RSBU - Building Final Passed 5/24/24: Ok for CofO
05/24/2024 COT - RSEL - Electrical Final Passed 5/24/24: Ok for CofO
05/24/2024 COT - RSEL - Outdoor Lighting Passed
05/24/2024 COT - RSME - Mechanical Final Passed 5/24/24: Ok for CofO
05/24/2024 COT - RSPL - Plumbing Final Passed 5/24/24: Ok for CofO

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
2018 PROBASCO RESIDENCE LAYOUT_V1.PDF DOCUMENTS VIEW
R81546890.J2400541A_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2018 W. PROBASCO DR - IMPROVE AND DESIGN-PDF_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET 2_V2.PDF DOCUMENTS VIEW