Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2302 N CAMINO MATEO
Apply Date:
01/30/2023
Applicant:
TFS Solar
Description:
roof mount 9.60 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]

Permit Reviews

Permit Number - TC-RES-0123-02469
Permit Status: Complete
Permit Description: roof mount 9.60 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Start Date Submittal Complete Date Status  
02/02/2023 RESIDENTIAL SOLAR v.1 02/17/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0123-02469
Permit Description: roof mount 9.60 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 200A bus with 175A MCB, [main breaker derate from existing 200A]
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/02/2023 BULD - Electrical Clearance Passed Approved, DGC Clearance to TEP is required for the solar meter
08/02/2023 RSBU - Building Final Passed
08/02/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CLOUD, R. PV 9.60 KW-SPECS_V1.PDF DOCUMENTS VIEW
CONS-CLOUD, R. PV 9.60 KW-DRAWINGS_V1.PDF DOCUMENTS VIEW