Permit: TC-RES-0123-02459
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
419 S COLONIA AV
Address NEW:
419 S COLONIA AV
Apply Date:
01/30/2023
Applicant:
TFS Solar
Description:
roof mount 10.08 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 225A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0123-02459
Permit Status: Complete
Permit Description: roof mount 10.08 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 225A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/02/2023 | RESIDENTIAL SOLAR v.1 | 02/17/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02459
Permite Description: roof mount 10.08 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 225A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02459
Permit Description: roof mount 10.08 kW DC photovoltaic solar system; 24 AC modules, 3 branches, PV subpanel, 50A PV breaker on 225A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/11/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
| 07/11/2023 | RSBU - Building Final | Passed | ||
| 07/11/2023 | COT - RSEL - Electrical Final | Passed |