Permit: TC-RES-0123-02378
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
31 E ELM ST
Address NEW:
31 E ELM ST
Apply Date:
01/25/2023
Applicant:
Luis Lopez
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0123-02378
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/08/2023 | APPROVED |
| 06/08/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/29/2023 | APPROVED |
| 08/15/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/21/2023 | APPROVED |
| 07/26/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/01/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0123-02378
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 06/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 06/29/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02378
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Obtain approval of roof and shear. |
| 07/26/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | |
| 07/26/2023 | COT - RSBU - Roof Nailing | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02378
Permit Description: SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a hydrostatic test. Okay to backfill and compact soil. | |
| 07/12/2023 | COT - RSEL - Grounding/Bonding | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 07/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 07/12/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 08/08/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/8/2023 | |
| 08/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/11/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8/11/2024 Approved with letter of responsibility. | |
| 08/11/2023 | COT - RSBU - Roof Nailing | Passed | 8/11/2024 Approved with letter of responsibility. | |
| 08/17/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 09/05/2023 | COT - RSPL - Sewer | Passed | ||
| 09/05/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 01/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 01/18/2024 | COT - RSEL - Electrical Final | Passed | ||
| 01/18/2024 | COT - RSME - Mechanical Final | Passed | ||
| 01/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 01/18/2024 | RSBU - Building Final | Passed |