Permit: TC-RES-0123-02376
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
25 E ELM ST
Address NEW:
25 E ELM ST
Apply Date:
01/25/2023
Applicant:
Luis Lopez
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0123-02376
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/21/2023 | APPROVED |
| 02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/27/2023 | REQUIRES RESUBMIT |
| 06/26/2023 | RESTAMP - RESIDENTIAL v.1 | 06/27/2023 | APPROVED |
| 06/02/2023 | RESIDENTIAL NEW DWELLING v.2 | 06/26/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0123-02376
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 07/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02376
Permite Description: SFR
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2023 | COT - RSEL - Electrical Final | N/A | Not Applicable | 10/20/23: duplicate inspection |
| 10/20/2023 | COT - RSME - Mechanical Final | N/A | Not Applicable | 10/20/23: duplicate inspection |
| 10/20/2023 | COT - RSPL - Plumbing Final | N/A | Not Applicable | 10/20/23: duplicate inspection |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02376
Permit Description: SFR
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a hydrostatic test. Okay to backfill and compact soil. | |
| 07/12/2023 | COT - RSEL - Grounding/Bonding | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 07/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 07/12/2023 | COT - RSBU - Preslab | Passed | Rebar reinforcement is properly installed per plans. Footings are 12 to 15 inches below native soil. Okay to pour concrete footings and slab on grade. User ground is installed on northeast corner of building. | |
| 07/26/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 07/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/02/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/2/23: Approved plans on site. Plumbing, electrical, and mechanical rough-in is complete. Okay to insulate, drywall, & texture walls once roofing is dried in. | |
| 08/08/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/8/2023 | |
| 09/05/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 09/05/2023 | COT - RSPL - Sewer | Passed | ||
| 10/02/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/20/2023 | RSBU - Building Final | Passed |