Permit: TC-RES-0123-02341
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
7254 E MANANA GRANDE PL
Address NEW:
7254 E MANANA GRANDE PL
Apply Date:
01/24/2023
Applicant:
leanne campos
Description:
New Residential Swimming pool
Permit Reviews
Permit Number - TC-RES-0123-02341
Permit Status: Issued
Permit Description: New Residential Swimming pool
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2023 | RESIDENTIAL NEW DWELLING v.2 | 03/10/2023 | APPROVED |
| 02/13/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/09/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0123-02341
Permite Description: New Residential Swimming pool
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | RSEL - Electrical Progress | N/A | Not Applicable | |
| 07/26/2023 | Pool/Spa - Electric | N/A | Partial Pass | 7/26/23: CMU pool barrier wall in alley is non-compliant for minimum height in a few areas, bond steel patio post to the pool bonding grid. OK to plaster at risk. |
| 07/26/2023 | COT - RSEL - Electrical Final | N/A | Partial Pass | 7/26/23: CMU pool barrier wall in alley is non-compliant for minimum height in a few areas, bond steel patio post to the pool bonding grid. OK to plaster at risk. |
| 07/26/2023 | RSBU - Building Final | N/A | Partial Pass | 7/26/23: CMU pool barrier wall in alley is non-compliant for minimum height in a few areas, bond steel patio post to the pool bonding grid. OK to plaster at risk. |
| 07/26/2023 | Pool/Spa - Final/Barrier | N/A | Re-inspection required | 7/26/23: CMU pool barrier wall in alley is non-compliant for minimum height in a few areas, bond steel patio post to the pool bonding grid. OK to plaster at risk. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0123-02341
Permit Description: New Residential Swimming pool
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | Pool/Spa - Bonding Grip | Passed | ||
| 04/13/2023 | Pool/Spa - Pre-Gunite | Passed | ||
| 07/26/2023 | Pool/Spa - Plumbing | Passed | ||
| 08/04/2023 | Pool/Spa - Electric | Passed | pool sub panel has all electrical requirements stated by plans | |
| 08/04/2023 | COT - RSEL - Electrical Final | Passed | ||
| 08/08/2023 | RSBU - Building Final | Passed | ||
| 08/08/2023 | Pool/Spa - Final/Barrier | Passed |