Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2770 W BLACK CLOUD CT
Apply Date:
01/24/2023
Applicant:
Chelsea Marshall
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0123-02336
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
02/28/2023 RESIDENTIAL NEW DWELLING v.1 03/27/2023 REQUIRES RESUBMIT Review Details
06/08/2023 RESIDENTIAL NEW DWELLING v.2 06/27/2023 APPROVED Review Details
07/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/18/2024 APPROVED Review Details
05/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/07/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0123-02336
Permit Status: Complete
Permit Description: SFR
Date Description Comments
06/27/2023 Post-Tension Inspection Report is required.
07/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0123-02336
Permite Description: SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/17/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 5/17/24: nailing not to schedule on west side of home
10/08/2024 COT - FCON - Sprinkler - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0123-02336
Permit Description: SFR
Total Completed Inspections - 17
Date Description Inspector Results Comments
04/09/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 4/9/2024
04/09/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 4/9/2024
04/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/19/2024 COT - RSBU - Preslab Passed
04/19/2024 COT - RSEL - Grounding/Bonding Passed
04/19/2024 COT - RSEL - Electrical Underground Passed
05/17/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/20/2024 COT - RSBU - Roof Nailing Passed
06/18/2024 COT - RSPL - Sewer Passed
07/03/2024 BULD - Electrical Clearance Passed TEP eco
07/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/17/24: partial pass for exterior only ok to stucco. Pending full interior inspection.
7/24/24: intermediate passed
08/05/2024 COT - RSBU - Interior Shear Bracing Passed
10/03/2024 COT - RSEL - Outdoor Lighting Passed
10/07/2024 COT - RSEL - Electrical Final Passed
10/07/2024 COT - RSME - Mechanical Final Passed
10/07/2024 COT - RSPL - Plumbing Final Passed
10/08/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
221257 LAS NUBES PT REPORT LOT 6-2024-07-09_V1.PDF DOCUMENTS VIEW
EOR STAMPED TRUSS APPROVAL-A JPS REV_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_MECHANICAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V2.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
1_SOIL REPORT_V1.PDF DOCUMENTS VIEW