Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0123-02335
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2759 W BLACK CLOUD CT
Address NEW:
2759 W BLACK CLOUD CT
Apply Date:
01/24/2023
Applicant:
Chelsea Marshall
Description:
SFR
Permit Reviews
Permit Number - TC-RES-0123-02335
Permit Status: Complete
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/01/2024 | RESIDENTIAL NEW DWELLING v.2 | 02/28/2024 | APPROVED |
| 07/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/26/2024 | APPROVED |
| 02/28/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/29/2023 | REQUIRES RESUBMIT |
| 07/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2024 | REQUIRES RESUBMIT |
| 05/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/06/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0123-02335
Permit Status: Complete
Permit Description: SFR
| Date | Description | Comments |
|---|---|---|
| 07/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/26/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/05/2024 | Post-Tension Inspection Report is required. | |
| 07/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/26/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02335
Permit Description: SFR
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2024 | COT - RSPL - Yard Water Line | Passed | 3/26/24: ok to backfill. Shading required. | |
| 04/10/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 04/10/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/11/2024 | COT - RSBU - Preslab | Passed | ||
| 05/06/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/06/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 6/7/2024 | |
| 06/12/2024 | COT - RSPL - Rough Soil | Passed | Connection to septic tank approved. System on test. 6/12/2024 | |
| 06/12/2024 | COT - RSPL - Sewer | Passed | Connection to septic tank approved. System on test. 6/12/2024 | |
| 06/20/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 6/20/2024 | |
| 06/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/14/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/15/2024 | RSBU - Building Progress | Passed | ||
| 08/15/2024 | COT - RSEL - Electrical Final | Passed | ||
| 08/15/2024 | COT - RSME - Mechanical Final | Passed | ||
| 08/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 08/16/2024 | RSBU - Building Final | Passed | 8/15/24: Hot and neutral reversed at kitchen circuit, Exterior plastic piping must be coated for UV protection, Garage door from living space does not self-close, arc-fault breakers missing throughout at sub-panel, all light fixtures must be installed or capped. 8/16/24: corrections made ok for CofO |