Permit: TC-RES-0123-02224
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
9258 E LA PALMA DR
Address NEW:
9258 E LA PALMA DR
Apply Date:
01/18/2023
Applicant:
Kim Henson
Description:
Garage Addition to Existing SFR
Permit Reviews
Permit Number - TC-RES-0123-02224
Permit Status: Complete
Permit Description: Garage Addition to Existing SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/02/2023 | APPROVED |
| 01/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/13/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0123-02224
Permit Status: Complete
Permit Description: Garage Addition to Existing SFR
| Date | Description | Comments |
|---|---|---|
| 04/05/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit. | |
| 05/02/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02224
Permite Description: Garage Addition to Existing SFR
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/27/2023 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02224
Permit Description: Garage Addition to Existing SFR
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2023 | BULD - Electrical Clearance | Passed | Not Ready - new panel ok with the exception of the ufer not being connected to future footing rebar. Clearance will be made when ufer installation is safely completed. 5/10/23: TEP INCR |
|
| 05/11/2023 | COT - RSPL - Gas Pressure Test | Passed | Partial Pass - new temp single run of yellow pipe ok to be backfilled. 5/10/23: remove temporary gas line under the new garage slab, and relocate it in front of the garage. 5/11/23: gas line and water service relocated in front of new garage slab. Both are temporary. SWG clearance issued. |
|
| 05/31/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 06/01/2023 | COT - BULD - SWG Clearance | Passed | cut over. | |
| 06/01/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/12/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/27/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 06/27/2023 | COT - RSBU - Preslab | Passed | ||
| 06/27/2023 | RSBU - Building Final | Passed | ||
| 06/27/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 06/27/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/27/2023 | COT - RSEL - Electrical Final | Passed |