Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0123-02201
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3315 S MANITOBA AV
Address NEW:
3315 S MANITOBA AV
Apply Date:
01/18/2023
Applicant:
BRANDY PALCHETTI
Description:
• SYSTEM SIZE: 6885W DC, 4930W AC • MODULES: (17) REC SOLAR: REC405AA PURE • INVERTERS: (17) ENPHASE ENERGY: IQ7PLUS-72-2-US • RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS STEEL HARDWARE
Permit Reviews
Permit Number - TC-RES-0123-02201
Permit Status: Complete
Permit Description: • SYSTEM SIZE: 6885W DC, 4930W AC
• MODULES: (17) REC SOLAR: REC405AA PURE
• INVERTERS: (17) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/19/2023 | RESIDENTIAL SOLAR v.1 | 02/03/2023 | APPROVED |
| 05/31/2023 | RESIDENTIAL SOLAR v.1 | 06/14/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02201
Permite Description: • SYSTEM SIZE: 6885W DC, 4930W AC
• MODULES: (17) REC SOLAR: REC405AA PURE
• INVERTERS: (17) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/20/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | 6/20/23 - NA for Solar |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0123-02201
Permit Description: • SYSTEM SIZE: 6885W DC, 4930W AC
• MODULES: (17) REC SOLAR: REC405AA PURE
• INVERTERS: (17) ENPHASE ENERGY: IQ7PLUS-72-2-US
• RACKING: SOLLEGA FASTRACK510 WITH 304 STAINLESS
STEEL HARDWARE
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP DGL. 6/30/2023 | |
| 06/30/2023 | RSBU - Building Final | Passed | ||
| 06/30/2023 | COT - RSEL - Electrical Final | Passed |