Permit: TC-MDP-1225-00809
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1325 W SPEEDWAY BL UNIT 2
Address NEW:
1325 W SPEEDWAY BL UNIT 2
Apply Date:
12/31/2025
Applicant:
Brandon Matheson
Description:
737-ADU Model Plan (Model Master Plan TC-MDP-1125-00735)
Permit Reviews
Permit Number - TC-MDP-1225-00809
Permit Status: Complete
Permit Description: 737-ADU Model Plan (Model Master Plan TC-MDP-1125-00735)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/16/2026 | REQUIRES RESUBMIT |
| 07/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/10/2026 | APPROVED |
| 02/06/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/19/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-1225-00809
Permit Status: Complete
Permit Description: 737-ADU Model Plan (Model Master Plan TC-MDP-1125-00735)
| Date | Description | Comments |
|---|---|---|
| 12/26/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 12/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/26/2025 | Manual J Report | |
| 12/26/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1225-00809
Permite Description: 737-ADU Model Plan (Model Master Plan TC-MDP-1125-00735)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 05/29/2026 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1225-00809
Permit Description: 737-ADU Model Plan (Model Master Plan TC-MDP-1125-00735)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2026 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 3/26/2026 | |
| 04/01/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/01/2026 | COT - RSBU - Preslab | Passed | ||
| 04/22/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/22/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/14/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/14/2026 | COT - RSPL - Yard Water Line | Passed | 5/14/2026 Holding under test, okay to backfill with shading material. |
|
| 05/14/2026 | COT - RSPL - Sewer | Passed | 5/14/2026 Holding under test with green tracer - ok to back with shading material. |
|
| 05/27/2026 | COT - RSBU - Roof Nailing | Passed | 05/27/2026 Passed prior. Verified Unit 1 & 2 drywall screws - okay to tape and texture. |
|
| 05/27/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | 05/27/2026 Verified exterior 5/8" type-x firewall. |
|
| 05/29/2026 | BULD - Electrical Clearance | Passed | 5/29/2026 Clearance TEP ECO. |
|
| 07/10/2026 | COT - RSEL - Electrical Final | Passed | ||
| 07/10/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/10/2026 | COT - RSME - Mechanical Final | Passed | ||
| 07/10/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 07/10/2026 | ENGR Engineering Final | Passed | ||
| 07/10/2026 | RSBU - Building Final | Passed |