Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/18/2025
Applicant:
CHARLES ELMER
Description:
model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)

Permit Reviews

Permit Number - TC-MDP-1225-00766
Permit Status: Complete
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Start Date Submittal Complete Date Status  
02/20/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/24/2026 APPROVED Review Details
01/21/2026 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 02/04/2026 APPROVED Review Details
12/22/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 12/22/2025 REQUIRES RESUBMIT Review Details
12/29/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 01/13/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-1225-00766
Permit Status: Complete
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Date Description Comments
01/13/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/09/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/09/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/09/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1225-00766
Permite Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/23/2026 COT - BULD - SWG Clearance N/A Not Applicable
09/23/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable
05/07/2026 RSBU - Building Progress N/A Partial Pass inspection called for electrical underground on Honda between the main and the subpanel on the front unit OK to proceed

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1225-00766
Permit Description: model Plan Alum 1585R (Model master plan TC-MDP-1222-00047)
Total Completed Inspections - 18

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
TRUSS LAYOUT AND CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
AS-1-2918 N TYNDALL-UNIT1-12-15-25-MODEL_V3.PDF DOCUMENTS VIEW
TYNDALL LETTER_V1.PDF DOCUMENTS VIEW