Permit: TC-MDP-1225-00757
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
2747 S AYALA ST
Address NEW:
2747 S AYALA ST
Apply Date:
02/05/2026
Applicant:
Mark Alteri
Description:
PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Permit Reviews
Permit Number - TC-MDP-1225-00757
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2026 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/18/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1225-00757
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/04/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-1225-00757
Permit Status: Inspections
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Date | Description | Comments |
|---|---|---|
| 12/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/04/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 02/10/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 12/04/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1225-00757
Permite Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 4.7.26 Trades present and working at time of inspection on intermediate construction despite not having passed clip/sheathing/framing This is a safety hazard for inspections/inspectors and out of procedural order due to ongoing work, trip hazards, and general equipment clutter blocking view for inspection areas. A courtesy walk was conducted in the non active areas/non cluttered areas. Anchorage missing under stairs. Over penetration at sheathing throughout with some examples marked in red. Anchor bolts required to be in the center 3rd of sill plate (marked) Truss calcs required to be on site INSPECTION STOPPED - ADDITIONAL ITEMS MAY BE ADDED |
| 04/07/2026 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 4.7.26 Trades present and working at time of inspection on intermediate construction despite not having passed clip/sheathing/framing This is a safety hazard for inspections/inspectors and out of procedural order due to ongoing work, trip hazards, and general equipment clutter blocking view for inspection areas. A courtesy walk was conducted in the non active areas/non cluttered areas. Anchorage missing under stairs. Over penetration at sheathing throughout with some examples marked in red. Anchor bolts required to be in the center 3rd of sill plate (marked) Truss calcs required to be on site INSPECTION STOPPED - ADDITIONAL ITEMS MAY BE ADDED |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1225-00757
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | COT - RSPL - Rough Soil | Passed | 3-12-26: underground plumbing approved-okay to backfill using shading materials. | |
| 03/12/2026 | COT - RSPL - Sewer | Passed | 3-12-26: sewer approved-okay to backfill using shading materials. | |
| 03/12/2026 | COT - RSPL - Yard Water Line | Passed | 3-12-26: main water line approved-okay to backfill using shading materials. | |
| 03/18/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 03/18/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 03/18/2026 | COT - RSBU - Preslab | Passed | 03/18/2026 Approved per site plan and reinforcement. Okay to pour. |
|
| 03/18/2026 | COT - RSEL - Electrical Underground | Passed |