Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
1232 E LIGGINS ST
Apply Date:
03/24/2026
Applicant:
Mark Alteri
Description:
PV 2378SFR (Model master plan TC-MDP-0124-00026) REV 4

Permit Reviews

Permit Number - TC-MDP-1225-00754
Permit Status: Inspections
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026) REV 4
Start Date Submittal Complete Date Status  
03/26/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/08/2026 APPROVED Review Details
09/04/2026 SPECIAL INSPECTION REVIEW v.1 09/04/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1225-00754
Permit Status: Inspections
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026) REV 4
Date Description Comments
03/27/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/03/2025 Post-Tension Inspection Report is required.
12/03/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/03/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/03/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1225-00754
Permit Description: PV 2378SFR (Model master plan TC-MDP-0124-00026) REV 4
Total Completed Inspections - 14
Date Description Inspector Results Comments
04/29/2026 COT - RSPL - Rough Soil Passed 4-29-26: underground plumbing verified under test & per approved plans. Okay to backfill using shading materials.
04/29/2026 COT - RSPL - Sewer Passed 4-29-26: sewer verified under test. Okay to backfill using shading materials.
04/29/2026 COT - RSPL - Yard Water Line Passed 4-29-26: main water line approved. Okay to backfill using shading materials.
05/05/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 05/05/2026
Approved per plan and reinforcements. Okay for concrete placement.
05/05/2026 COT - RSBU - Preslab Passed 05/05/2026
Approved per plan and reinforcements. Okay for concrete placement.
05/05/2026 COT - RSEL - Electrical Underground Passed
06/12/2026 COT - RSBU - Roof Nailing Passed 06/12/2026
Verified roof nail schedule and truss calcs.
06/18/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 06/18/2026
Corrections made to prior inspection.
07/06/2026 RSBU - Building Progress Passed
07/15/2026 BULD - Electrical Clearance Passed 07/15/2026
Clearance TEP ECO.
07/30/2026 COT - RSPL - Gas Pressure Test Passed
08/05/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 08/05/2026
Corrections made.
08/18/2026 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 8-18-26: interior firewall approved.
08/18/2026 COT - RSBU - Interior Shear Bracing Passed 8-18-26: interior shear bracing approved. Okay to tape & texture drywall.