Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7350 S DEMPSEY AV
Apply Date:
05/30/2025
Applicant:
Celina Rodriguez
Description:
KB Home 1768 (Model Master Plan TC-MDP-1124-01303)

Permit Reviews

Permit Number - TC-MDP-1224-01411
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Start Date Submittal Complete Date Status  
06/18/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 06/18/2025 APPROVED Review Details
06/18/2025 RESTAMP - RESIDENTIAL v.1 06/23/2025 APPROVED Review Details
06/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/13/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01411
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Activity Conditions - 5
Date Name
06/10/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/10/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/10/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/10/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
12/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01411
Permit Status: Inspections complete
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Date Description Comments
12/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01411
Permite Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/26/2025 COT - BULD - SWG Clearance N/A Not Applicable site does not use gas
07/07/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial pass for ufer, will check connection at later date

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01411
Permit Description: KB Home 1768 (Model Master Plan TC-MDP-1124-01303)
Total Completed Inspections - 20
Date Description Inspector Results Comments
06/26/2025 COT - RSPL - Sewer Passed Passed 6/26/25 ok to backfill
06/26/2025 COT - RSPL - Yard Water Line Passed Passed 6/26/25 ok to backfill
06/26/2025 COT - RSPL - Rough Soil Passed Passed 6/26/25 ok to backfill
07/07/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 7/7/25 ok to pour concrete
07/07/2025 COT - RSBU - Preslab Passed Passed 7/7/25 ok to pour concrete
07/07/2025 COT - RSEL - Electrical Underground Passed Passed 7/7/25 ok to pour concrete
07/21/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 7/21/25
07/21/2025 COT - RSBU - Roof Nailing Passed Passed 7/21/25
08/11/2025 COT - RSEL - Grounding/Bonding Passed Approved
08/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8/14/25 corrections made
08/14/2025 BULD - Electrical Clearance Passed Ready for temp power clearance ECO
08/25/2025 COT - RSBU - Interior Shear Bracing Passed
10/13/2025 COT - RSME - Mechanical Final Passed
10/13/2025 COT - RSEL - Electrical Final Passed
10/13/2025 COT - RSEL - Outdoor Lighting Passed
10/13/2025 COT - RSPL - Gas Pressure Test Passed
10/13/2025 COT - RSPL - Plumbing Final Passed
10/13/2025 RSBU - Building Progress Passed
10/15/2025 RSBU - Building Final Passed
10/15/2025 ENGR Engineering Final Passed site is complete in accordance with approved plans.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 6 START_V2.PDF DOCUMENTS VIEW