Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
N/A
Type:
N/A
Apply Date:
N/A
Applicant:
Celina Rodriguez
Description:
N/A

Permit Reviews

Permit Number - TC-MDP-1224-01408
Permit Status:
Permit Description:
Start Date Submittal Complete Date Status  
02/12/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01408
Permit Status:
Permit Description:
Total Outstanding Activity Conditions - 1
Date Name
12/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01408
Permit Status:
Permit Description:
Date Description Comments
12/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.