Permit: TC-MDP-1224-01393
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
7379 S KELLER LN
Address NEW:
7379 S KELLER LN
Apply Date:
12/23/2024
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)
Permit Reviews
Permit Number - TC-MDP-1224-01393
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 12/31/2024 | APPROVED |
| 12/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/26/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1224-01393
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-1224-01393
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
| Date | Description | Comments |
|---|---|---|
| 12/20/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1224-01393
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-21-25, firefoam missing throughout both levels (top plates, chutes), seal lower level to upper decking at marked areas and seal,vapor barrier at east upstairs shower. |
| 02/12/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | n/a |
| 02/12/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | n/a |
| 02/12/2025 | COT - RSEL - Electrical Final | N/A | Partial Pass | 2/12/25 electrical receptacles missing plates, partial |
| 02/12/2025 | COT - RSPL - Plumbing Final | N/A | Partial Pass | 2/12/25 exterior drain and vents must be painted. Partial pass |
| 02/13/2025 | ENGR Engineering Final | N/A | Partial Pass | TCO4 is approved, landscaping needs to be completed, ADA parking needs to be striped. |
| 02/12/2025 | RSBU - Building Final | N/A | Partial Pass | 2/12/25 exterior drain and vents must be painted. Partial pass. Electrical receptacles missing plates. Partial pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1224-01393
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | COT - RSPL - Rough Soil | Passed | Plumbing per plan, no leaks, main water line on air test. Ok to backfill 1/7/25 | |
| 01/07/2025 | COT - RSPL - Sewer | Passed | Plumbing per plan, no leaks, main water line on air test. Ok to backfill 1/7/25 | |
| 01/07/2025 | COT - RSPL - Yard Water Line | Passed | Plumbing per plan, no leaks, main water line on air test. Ok to backfill 1/7/25 | |
| 01/08/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and tie downs per plan, electrical present. Ok to pour concrete 1/8/25 | |
| 01/08/2025 | COT - RSBU - Preslab | Passed | Rebar and tie downs per plan, electrical present. Ok to pour concrete 1/8/25 | |
| 01/08/2025 | COT - RSEL - Electrical Underground | Passed | Rebar and tie downs per plan, electrical present. Ok to pour concrete 1/8/25 | |
| 01/08/2025 | COT - RSEL - Grounding/Bonding | Passed | Rebar and tie downs per plan, electrical present. Ok to pour concrete 1/8/25 | |
| 01/14/2025 | COT - RSBU - Roof Nailing | Passed | 1-14-25, roof nailing approved. Okay to dry in roof. | |
| 01/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1-14-25, exterior clip/sheathing approved. Okay to continue with construction. | |
| 01/14/2025 | BULD - Electrical Clearance | Passed | 1-14-25, panel approved to be energized. ECO clearance sent to TEP. | |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/22/25 corrections were made. Pass | |
| 01/24/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/24/25 pass | |
| 02/12/2025 | COT - RSEL - Outdoor Lighting | Passed | 2/12/25 pass | |
| 02/12/2025 | COT - RSME - Mechanical Final | Passed | 2/12/25 pass | |
| 02/12/2025 | RSBU - Building Progress | Passed | ||
| 02/14/2025 | COT - RSEL - Electrical Final | Passed | 2/14/25 corrections made CLEARANCE ECO | |
| 02/14/2025 | COT - RSPL - Plumbing Final | Passed | 2/14/25 corrections made | |
| 02/14/2025 | RSBU - Building Final | Passed | 2/14/25 corrections made |