Permit: TC-MDP-1224-01384
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
256 N SUNNY COVE PL
Address NEW:
256 N SUNNY COVE PL
Apply Date:
12/09/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Permit Reviews
Permit Number - TC-MDP-1224-01384
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/01/2025 | REQUIRES RESUBMIT |
| 12/18/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/30/2024 | APPROVED |
| 05/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/19/2025 | APPROVED |
| 02/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/06/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1224-01384
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
| Date | Description | Comments |
|---|---|---|
| 12/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 12/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/19/2024 | Post-Installed Anchor Inspection Report is required. | |
| 12/19/2024 | Post-Tension Inspection Report is required. | |
| 12/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 05/16/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1224-01384
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2025 | COT - RSPL - Backwater Valve | Passed | Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill | |
| 03/03/2025 | COT - RSPL - Rough Soil | Passed | Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill | |
| 03/03/2025 | COT - RSPL - Sewer | Passed | Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill | |
| 03/03/2025 | COT - RSPL - Yard Water Line | Passed | Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill | |
| 03/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete. | |
| 03/10/2025 | COT - RSBU - Preslab | Passed | 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete. | |
| 03/10/2025 | COT - RSEL - Electrical Underground | Passed | 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete. | |
| 03/19/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3-19-25, exterior clips/sheathing approved. Okay to continue with construction | |
| 03/19/2025 | COT - RSBU - Roof Nailing | Passed | 3-19-25, roof nailing, exterior clips/sheathing approved. Okay to continue with construction | |
| 04/09/2025 | BULD - Electrical Clearance | Passed | ||
| 04/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/09/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/09/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/30/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 4/30/25 ok to tape and mud | |
| 06/06/2025 | COT - BULD - SWG Clearance | Passed | 6/6/25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 06/18/2025 | COT - RSEL - Electrical Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSME - Mechanical Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | RSBU - Building Final | Passed | Passed final 6/18/25 | |
| 06/18/2025 | RSBU - Building Progress | Passed | Passed final 6/18/25 | |
| 06/20/2025 | ENGR Engineering Final | Passed |