Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
256 N SUNNY COVE PL
Apply Date:
12/09/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)

Permit Reviews

Permit Number - TC-MDP-1224-01384
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Start Date Submittal Complete Date Status  
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/01/2025 REQUIRES RESUBMIT Review Details
12/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/30/2024 APPROVED Review Details
05/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/19/2025 APPROVED Review Details
02/05/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1224-01384
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Date Description Comments
12/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/19/2024 Post-Installed Anchor Inspection Report is required.
12/19/2024 Post-Tension Inspection Report is required.
12/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/16/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1224-01384
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/03/2025 COT - RSPL - Backwater Valve Passed Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill
03/03/2025 COT - RSPL - Rough Soil Passed Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill
03/03/2025 COT - RSPL - Sewer Passed Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill
03/03/2025 COT - RSPL - Yard Water Line Passed Plumbing per plans, sewer connection and main water line per code 3/3/25 ok to backfill
03/10/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete.
03/10/2025 COT - RSBU - Preslab Passed 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete.
03/10/2025 COT - RSEL - Electrical Underground Passed 3-10-25, excavation/rebar/setbacks, underground electric and preslab verified per approved plans. Okay to pour concrete.
03/19/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3-19-25, exterior clips/sheathing approved. Okay to continue with construction
03/19/2025 COT - RSBU - Roof Nailing Passed 3-19-25, roof nailing, exterior clips/sheathing approved. Okay to continue with construction
04/09/2025 BULD - Electrical Clearance Passed
04/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/09/2025 COT - RSPL - Gas Pressure Test Passed
04/09/2025 COT - RSEL - Grounding/Bonding Passed
04/30/2025 COT - RSBU - Interior Shear Bracing Passed Passed 4/30/25 ok to tape and mud
06/06/2025 COT - BULD - SWG Clearance Passed 6/6/25
SOUTHWEST GAS CLEARANCE: SWG
06/18/2025 COT - RSEL - Electrical Final Passed Passed final 6/18/25
06/18/2025 COT - RSEL - Outdoor Lighting Passed Passed final 6/18/25
06/18/2025 COT - RSME - Mechanical Final Passed Passed final 6/18/25
06/18/2025 COT - RSPL - Plumbing Final Passed Passed final 6/18/25
06/18/2025 RSBU - Building Final Passed Passed final 6/18/25
06/18/2025 RSBU - Building Progress Passed Passed final 6/18/25
06/20/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
242218 - HOUGHTON RESERVE PH 2 - LOT 155 - PT-2025-05-14_V1.PDF DOCUMENTS VIEW
LOT 155 SPECIAL INSPECTION CERTIFICATE REVISED2-2025-02-04_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 155 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 155 SPECIAL INSPECTION CERTIFICATE-2024-12-09_V1.PDF DOCUMENTS VIEW