Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
306 N SPRING FLOWER DR
Apply Date:
12/09/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)

Permit Reviews

Permit Number - TC-MDP-1224-01383
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Start Date Submittal Complete Date Status  
05/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/23/2025 APPROVED Review Details
12/18/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/26/2024 APPROVED Review Details
01/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 APPROVED Review Details
07/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1224-01383
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Date Description Comments
12/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/19/2024 Post-Installed Anchor Inspection Report is required.
12/19/2024 Post-Tension Inspection Report is required.
12/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
12/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/21/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1224-01383
Permite Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/10/2025 RSBU - Building Progress N/A Not Applicable
04/22/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Add anchor bolts at 3 marked locations
04/09/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass under slab only

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1224-01383
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/01/2025 COT - RSPL - Rough Soil Passed Passed 4/1/25 ok to backfill
04/01/2025 COT - RSPL - Sewer Passed Passed 4/1/25 ok to backfill
04/01/2025 COT - RSPL - Yard Water Line Passed Passed 4/1/25 ok to backfill
04/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/09/2025 COT - RSBU - Preslab Passed
04/09/2025 COT - RSEL - Electrical Underground Passed
04/22/2025 COT - RSBU - Roof Nailing Passed Passed 4/22/25
05/08/2025 COT - RSEL - Grounding/Bonding Passed 5/8/25 passed
05/08/2025 BULD - Electrical Clearance Passed 5/8/25 passed CLEARANCE ECO
05/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/8/25 passed
05/08/2025 COT - RSPL - Gas Pressure Test Passed 5/8/25 passed
05/20/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/20/25
07/03/2025 COT - BULD - SWG Clearance Passed
07/09/2025 COT - RSEL - Electrical Final Passed Passed final 7/9/25
07/09/2025 COT - RSEL - Outdoor Lighting Passed Passed final 7/9/25
07/09/2025 COT - RSME - Mechanical Final Passed Passed final 7/9/25
07/09/2025 COT - RSPL - Plumbing Final Passed Passed final 7/9/25
07/09/2025 ENGR Engineering Final Passed Some of the cap blocks at the top of the walls are missing. Both the the north and south sides finished.
07/09/2025 RSBU - Building Final Passed Passed final 7/9/25

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
242218 - HOUGHTON RESERVE - LOT 38 - FINAL PT-2025-05-19_V1.PDF DOCUMENTS VIEW
LOT 38 SPECIAL INSPECTION CERTIFICATE REVISED-2025-01-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 38 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 38 SPECIAL INSPECTION CERTIFICATE-2024-12-09_V1.PDF DOCUMENTS VIEW