Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
12/31/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)

Permit Reviews

Permit Number - TC-MDP-1224-01374
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Start Date Submittal Complete Date Status  
01/06/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/13/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1224-01374
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Total Outstanding Activity Conditions - 3
Date Name
01/06/2025 Post-Installed Anchor Inspection Report is required.
01/06/2025 Post-Tension Inspection Report is required.
12/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-1224-01374
Permit Status: Inspections
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Date Description Comments
01/06/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1224-01374
Permite Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/30/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 1/30/25 ufer is anchored to footer. Partial pass

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-1224-01374
Permit Description: SFR BT1383-130 T22-M0014 (Model masterplan TC-MDP-0223-00390)
Total Completed Inspections - 6
Date Description Inspector Results Comments
01/23/2025 COT - RSPL - Yard Water Line Passed 1-23-25, main water line, underground plumbing verified as per approved plans. Okay to backfill-provide shading.
01/23/2025 COT - RSPL - Sewer Passed 1-23-25, sewer connection, main water line, underground plumbing verified as per approved plans. Okay to backfill-provide shading.
01/23/2025 COT - RSPL - Rough Soil Passed 1-23-25, underground plumbing verified as per approved plans. Okay to backfill-provide shading.
01/30/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/30/25 pass
01/30/2025 COT - RSBU - Preslab Passed 1/30/26 pass
01/30/2025 COT - RSEL - Electrical Underground Passed 1/30/25 pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 53 START_V1.PDF DOCUMENTS VIEW
BTIII 53 SIC-2024-12-31_V1.PDF DOCUMENTS VIEW