Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1224-01367
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
3934 E ELMWOOD ST
Address NEW:
3934 E ELMWOOD ST
Apply Date:
12/09/2024
Applicant:
Jesus Lozano
Description:
model plan template SFR (Model master plan TC-MDP-1024-01263)
Permit Reviews
Permit Number - TC-MDP-1224-01367
Permit Status: Inspections complete
Permit Description: model plan template SFR (Model master plan TC-MDP-1024-01263)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 03/26/2025 | REQUIRES RESUBMIT |
| 01/24/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 02/06/2025 | REQUIRES RESUBMIT |
| 12/17/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 01/13/2025 | REQUIRES RESUBMIT |
| 03/26/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.5 | 03/27/2025 | APPROVED |
| 02/07/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 02/25/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1224-01367
Permit Status: Inspections complete
Permit Description: model plan template SFR (Model master plan TC-MDP-1024-01263)
| Date | Description | Comments |
|---|---|---|
| 03/26/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 12/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01367
Permite Description: model plan template SFR (Model master plan TC-MDP-1024-01263)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 05/06/2025 | RSBU - Building Progress | N/A | Not Applicable | |
| 06/02/2025 | COT - RSPL - Sewer | N/A | Partial Pass | Partial pass. Sewer lines to second clean outs approved. Okay to backfill progress areas. Shading required. Pending tie into main sewer line. 6/2/2025 |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1224-01367
Permit Description: model plan template SFR (Model master plan TC-MDP-1024-01263)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2025 | COT - RSPL - Rough Soil | Passed | Plumbing per plan, ok to backfill 3/28/25 | |
| 04/02/2025 | COT - RSBU - Preslab | Passed | Ensure slab area is termite treated. | |
| 04/29/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 04/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 04/29/2025 | COT - RSBU - Interior Shear Bracing | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 04/29/2025 | COT - RSBU - Roof Nailing | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 04/29/2025 | COT - RSEL - Electrical Underground | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 04/29/2025 | COT - RSEL - Grounding/Bonding | Passed | Approved per Robert Chandler on clip nail/ roof nailing. Jim Burge for intermediate. Reference to Tc-res-1223-10006. 4/29/2025 | |
| 05/06/2025 | COT - RSBU - Masonry Pregrout | Passed | ||
| 05/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5/28/25 TEP CLEARANCE:ECO |
|
| 05/28/2025 | COT - RSEL - Electrical Final | Passed | 5/28/25 Pass |
|
| 06/02/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 6/2/2025 | |
| 07/14/2025 | COT - RSPL - Sewer | Passed | 7/14/25 Pass, shading required. |
|
| 11/13/2025 | COT - BULD - SWG Clearance | Passed | Southwest Gas Clearance: SWG | |
| 11/13/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/19/2025 | COT - RSME - Mechanical Final | Passed | ||
| 11/19/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/19/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 11/19/2025 | RSBU - Building Final | Passed |