Permit: TC-MDP-1223-01923
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
3099 N SIBLEY MINE RD
Address NEW:
3099 N SIBLEY MINE RD
Apply Date:
04/01/2024
Applicant:
Description:
SFR K35G T21-M0033
Permit Reviews
Permit Number - TC-MDP-1223-01923
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1223-01923
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 04/04/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-1223-01923
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
| Date | Description | Comments |
|---|---|---|
| 12/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01923
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2024 | COT - RSPL - Rough Soil | Passed | 5/20/24: plumbing underground ok to backfill. Shading required | |
| 05/20/2024 | COT - RSPL - Sewer | Passed | 5/20/24: HCS connection ok to backfill. Shading required | |
| 05/20/2024 | COT - RSPL - Yard Water Line | Passed | 5/20/24: water line under pressure ok to backfill. Shading required | |
| 05/29/2024 | COT - RSBU - Preslab | Passed | ||
| 05/29/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 05/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/27/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/22/2024 | BULD - Electrical Clearance | Passed | 7/22/24: TEP ECO CLEARANCE FOR 3099 N SIBLEY MINE RD | |
| 07/22/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/23/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/01/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/11/2024 | COT - BULD - SWG Clearance | Passed | 9/11/24: SWG clearance ok for meter tag | |
| 09/26/2024 | COT - RSEL - Electrical Final | Passed | All electrical was verified to be in working condition and installed per approved plans. | |
| 09/26/2024 | COT - RSEL - Outdoor Lighting | Passed | All outdoor light installed per approved plans. | |
| 09/26/2024 | COT - RSME - Mechanical Final | Passed | All mechanical verified as functional and installed per approved plans. | |
| 09/26/2024 | COT - RSPL - Plumbing Final | Passed | All plumbing in operating condition and installed per approved plans. | |
| 09/26/2024 | ENGR Engineering Final | Passed | ||
| 09/26/2024 | RSBU - Building Final | Passed | Building final approved. | |
| 09/26/2024 | RSBU - Building Progress | Passed | Approved. |