Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
3063 N SIBLEY MINE RD
Apply Date:
06/04/2024
Applicant:
Description:
SFR K35G T21-M0033

Permit Reviews

Permit Number - TC-MDP-1223-01922
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Start Date Submittal Complete Date Status  
06/04/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/06/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1223-01922
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Total Outstanding Activity Conditions - 3
Date Name
06/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/05/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1223-01922
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Date Description Comments
12/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01922
Permite Description: SFR K35G T21-M0033
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/16/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Partial for UFER

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1223-01922
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/03/2024 COT - RSPL - Rough Soil Passed 7/3/24: plumbing per plan ok to backfill. Shading required.
07/03/2024 COT - RSPL - Sewer Passed 7/3/24: plumbing per plan ok to backfill. Shading required.
07/03/2024 COT - RSPL - Yard Water Line Passed 7/3/24: plumbing per plan ok to backfill. Shading required.
07/15/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/15/2024 COT - RSBU - Preslab Passed
07/15/2024 COT - RSEL - Electrical Underground Passed
08/07/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/07/2024 COT - RSBU - Roof Nailing Passed
09/03/2024 COT - RSPL - Gas Pressure Test Passed
09/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/04/2024 COT - RSEL - Grounding/Bonding Passed
09/16/2024 BULD - Electrical Clearance Passed
09/16/2024 COT - RSBU - Interior Shear Bracing Passed
10/28/2024 COT - BULD - SWG Clearance Passed PASSED SW GAS CLEARANCE 10/28/28
11/12/2024 COT - RSEL - Electrical Final Passed
11/12/2024 COT - RSEL - Outdoor Lighting Passed
11/12/2024 COT - RSME - Mechanical Final Passed
11/12/2024 COT - RSPL - Plumbing Final Passed
11/12/2024 ENGR Engineering Final Passed
11/12/2024 RSBU - Building Final Passed
11/12/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-06-04_V1.PDF DOCUMENTS VIEW