Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-1223-01916
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
10/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/29/2024 APPROVED Review Details
01/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1223-01916
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
01/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/11/2024 Post-Tension Inspection Report is required.
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1223-01916
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/22/2024 COT - RSPL - Backwater Valve Passed
04/22/2024 COT - RSPL - Yard Water Line Passed
04/22/2024 COT - RSPL - Sewer Passed
04/22/2024 COT - RSPL - Rough Soil Passed
05/01/2024 COT - RSBU - Preslab Passed
05/01/2024 COT - RSEL - Grounding/Bonding Passed
05/01/2024 COT - RSEL - Electrical Underground Passed
05/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/13/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/13/2024 COT - RSBU - Roof Nailing Passed
06/05/2024 BULD - Electrical Clearance Passed All ground wires are connected to the ground bus bar and to the Ufer ground. Breakers are installed in panel for temporary power and GFCI receptacle is connected to the bottom of panel box. Issuing a ECO Clearance to TEP FOR 155 N SPRING FLOWER DR.
06/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete and meets code requirements. Okay to proceed with installation of insulation and drywall throughout.
06/05/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under air pressure at 15#, with no leaks. Okay to proceed.
07/03/2024 COT - RSBU - Interior Shear Bracing Passed Shear walls are properly screwed per plan requirements. Okay to proceed with tape, texture, and paint.
08/07/2024 COT - BULD - SWG Clearance Passed All piped locations for gas appliances have gas valves installed. Okay to install gas meter. SWG Clearance issued.
08/19/2024 COT - RSEL - Outdoor Lighting Passed
08/19/2024 COT - RSME - Mechanical Final Passed
08/19/2024 RSBU - Building Progress Passed
08/19/2024 ENGR Engineering Final Passed
08/20/2024 COT - RSEL - Electrical Final Passed
08/20/2024 COT - RSPL - Plumbing Final Passed
08/20/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147305 PT LOT 202 COMPLETE-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 202 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 202 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 202 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW