Permit: TC-MDP-1223-01916
Permit Details
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-1223-01916
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/28/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/29/2024 | APPROVED |
01/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/11/2024 | APPROVED |
06/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1223-01916
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
01/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/11/2024 | Post-Tension Inspection Report is required. | |
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
01/11/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1223-01916
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/22/2024 | COT - RSPL - Backwater Valve | Passed | ||
04/22/2024 | COT - RSPL - Yard Water Line | Passed | ||
04/22/2024 | COT - RSPL - Sewer | Passed | ||
04/22/2024 | COT - RSPL - Rough Soil | Passed | ||
05/01/2024 | COT - RSBU - Preslab | Passed | ||
05/01/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
05/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
05/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
05/13/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
05/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/05/2024 | BULD - Electrical Clearance | Passed | All ground wires are connected to the ground bus bar and to the Ufer ground. Breakers are installed in panel for temporary power and GFCI receptacle is connected to the bottom of panel box. Issuing a ECO Clearance to TEP FOR 155 N SPRING FLOWER DR. | |
06/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete and meets code requirements. Okay to proceed with installation of insulation and drywall throughout. | |
06/05/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under air pressure at 15#, with no leaks. Okay to proceed. | |
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | Shear walls are properly screwed per plan requirements. Okay to proceed with tape, texture, and paint. | |
08/07/2024 | COT - BULD - SWG Clearance | Passed | All piped locations for gas appliances have gas valves installed. Okay to install gas meter. SWG Clearance issued. | |
08/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/19/2024 | COT - RSME - Mechanical Final | Passed | ||
08/19/2024 | RSBU - Building Progress | Passed | ||
08/19/2024 | ENGR Engineering Final | Passed | ||
08/20/2024 | COT - RSEL - Electrical Final | Passed | ||
08/20/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/20/2024 | RSBU - Building Final | Passed |