Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-1223-01914
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2024 APPROVED Review Details
05/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
01/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1223-01914
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
01/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1223-01914
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/08/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1223-01914
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/22/2024 COT - RSPL - Rough Soil Passed
03/22/2024 COT - RSPL - Yard Water Line Passed
04/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/08/2024 COT - RSBU - Preslab Passed
04/24/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with H2.5 clips. Plywood sheathing is properly secured to roof trusses and nailed per plans. Okay to dry-in roof.
04/24/2024 COT - RSBU - Exterior Clips/Sheathing Passed Masa clips and shear wall clips are properly nailed, base plates are shot/bolted/cut nailed down to the concrete floor. Sheathing for shear walls are properly nailed to the studs. Okay to proceed with window installation.
05/06/2024 COT - RSPL - Sewer Passed Sewer line is connected to underground plumbing and under a water test. Okay to shade pipe and backfill trench.
05/24/2024 BULD - Electrical Clearance Passed TEP ECO Clearance issued.
05/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with insulation and drywall installation.
05/24/2024 COT - RSPL - Gas Pressure Test Passed gas lines are under 15# of air pressure with no leaks. okay to proceed.
06/18/2024 COT - RSBU - Interior Shear Bracing Passed
07/26/2024 COT - BULD - SWG Clearance Passed
08/09/2024 COT - RSEL - Electrical Final Passed
08/09/2024 COT - RSEL - Electrical Underground Passed
08/09/2024 COT - RSEL - Outdoor Lighting Passed
08/09/2024 COT - RSME - Mechanical Final Passed
08/09/2024 COT - RSPL - Plumbing Final Passed
08/09/2024 RSBU - Building Final Passed
08/09/2024 RSBU - Building Progress Passed
09/11/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146783 PT LOT 211 COMPLETE-2024-05-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 211 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 211 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 211 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW