Permit Reviews
Permit Number - TC-MDP-1223-01884
Permit Status: Inspections
Permit Description: 01 T22-M0058 (Model master plan TC-MDP-0123-00197)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
| 06/17/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1223-01884
Permit Status: Inspections
Permit Description: 01 T22-M0058 (Model master plan TC-MDP-0123-00197)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/21/2024 | Post-Tension Inspection Report is required. |
| 06/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 06/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-1223-01884
Permit Status: Inspections
Permit Description: 01 T22-M0058 (Model master plan TC-MDP-0123-00197)
| Date | Description | Comments |
|---|---|---|
| 07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 12/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1223-01884
Permite Description: 01 T22-M0058 (Model master plan TC-MDP-0123-00197)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 11-22-24, drywall tapers had already taped most of the the home but left the shear walls untouched. Contractor to provide a letter indicating that all nailing was done per approved plans. Okay to proceed at own risk. Letter is required prior to issuing c of o. |
| 01/31/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 1/31/25 circuit breaker for AC must be 25amp and AC unit requires 25amp fuse. Re inspection required. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1223-01884
Permit Description: 01 T22-M0058 (Model master plan TC-MDP-0123-00197)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/8/2024 | |
| 08/08/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/8/2024 | |
| 08/08/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/8/2024 | |
| 08/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/21/2024 | COT - RSBU - Preslab | Passed | ||
| 08/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Corrections were made. 10/11/2024 | |
| 10/28/2024 | BULD - Electrical Clearance | Passed | 10-28-24, electrical clearance to TEP approved. | |
| 10/28/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-28-24, gas pressure test approved. | |
| 10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, previously noted items requiring correction have been rectified. Intermediate inspection approved. | |
| 10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, previously noted items requiring correction have been rectified. Intermediate inspection approved. | |
| 01/17/2025 | COT - BULD - SWG Clearance | Passed | Passed clearance SWG 1/17/25 | |
| 01/31/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/31/25 pass | |
| 01/31/2025 | COT - RSEL - Outdoor Lighting | Passed | 1/31’25 pass | |
| 01/31/2025 | COT - RSPL - Plumbing Final | Passed | 1/31/25 pass | |
| 01/31/2025 | ENGR Engineering Final | Passed | No address | |
| 02/03/2025 | COT - RSME - Mechanical Final | Passed | 2/3/25 corrections made | |
| 02/03/2025 | RSBU - Building Final | Passed | 2/3/25 corrections made |