Permit: TC-MDP-1223-01884
Permit Details
Apply Date:
06/13/2024
Applicant:
Don Anderson
Description:
01 T22-M0058
Permit Reviews
Permit Number - TC-MDP-1223-01884
Permit Status: Issued
Permit Description: 01 T22-M0058
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/17/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1223-01884
Permit Status: Issued
Permit Description: 01 T22-M0058
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
06/21/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/21/2024 | Post-Tension Inspection Report is required. |
06/21/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
06/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-1223-01884
Permit Status: Issued
Permit Description: 01 T22-M0058
Date | Description | Comments |
---|---|---|
07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-1223-01884
Permite Description: 01 T22-M0058
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 11-22-24, drywall tapers had already taped most of the the home but left the shear walls untouched. Contractor to provide a letter indicating that all nailing was done per approved plans. Okay to proceed at own risk. Letter is required prior to issuing c of o. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-1223-01884
Permit Description: 01 T22-M0058
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/8/2024 | |
08/08/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/8/2024 | |
08/08/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/8/2024 | |
08/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/21/2024 | COT - RSBU - Preslab | Passed | ||
08/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
09/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/11/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 10/11/2024 | |
10/28/2024 | BULD - Electrical Clearance | Passed | 10-28-24, electrical clearance to TEP approved. | |
10/28/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-28-24, gas pressure test approved. | |
10/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-31-24, previously noted items requiring correction have been rectified. Intermediate inspection approved. | |
10/31/2024 | RSBU - Building Progress | Passed | 10-31-24, previously noted items requiring correction have been rectified. Intermediate inspection approved. |