SFR BT1740-130 T22-M0015
Permit Reviews
Permit Number - TC-MDP-1222-00178
Permit Status: Complete
Permit Description: SFR BT1740-130 T22-M0015
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/27/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/03/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1222-00178
Permit Status: Complete
Permit Description: SFR BT1740-130 T22-M0015
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/01/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
02/01/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/01/2023 | Post-Installed Anchor Inspection Report is required. |
02/01/2023 | Post-Tension Inspection Report is required. |
02/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1222-00178
Permite Description: SFR BT1740-130 T22-M0015
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | missing HTT5 at kitchen. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1222-00178
Permit Description: SFR BT1740-130 T22-M0015
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to main water meter. Tracer wire is installed. Okay to backfill trenches. | |
02/27/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer system. Okay to backfill trenches | |
02/27/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is installed and under water test. Okay to backfill trenches. | |
03/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
03/06/2023 | COT - RSBU - Preslab | Passed | ||
03/06/2023 | COT - RSEL - Electrical Underground | Passed | ||
03/16/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/23/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/07/2023 | COT - RSPL - Gas Pressure Test | Passed | pass | |
04/24/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
05/03/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/10/2023 | COT - BULD - SWG Clearance | Passed | ||
07/18/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/18/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/18/2023 | COT - RSPL - Gas Final | Passed | ||
07/18/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
07/18/2023 | COT - RSEL - Electrical Final | Passed | ||
07/18/2023 | RSBU - Building Progress | Passed | ||
07/20/2023 | COT - RSME - Mechanical Final | Passed | ||
07/20/2023 | RSBU - Building Final | Passed |