Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
12/06/2022
Applicant:
Richard Willard
Description:
SFR LE23003 T22-M0056

Permit Reviews

Permit Number - TC-MDP-1222-00124
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Start Date Submittal Complete Date Status  
01/31/2023 RESIDENTIAL NEW DWELLING v.2 03/02/2023 APPROVED Review Details
12/20/2022 RESIDENTIAL NEW DWELLING v.1 12/22/2022 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1222-00124
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 3
Date Name
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/20/2022 Post-Tension Inspection Report is required.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1222-00124
Permit Description: SFR LE23003 T22-M0056
Total Completed Inspections - 24
Date Description Inspector Results Comments
03/03/2023 COT - RSPL - Rough Soil Passed
03/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
03/09/2023 COT - RSBU - Preslab Passed
03/09/2023 COT - RSEL - Grounding/Bonding Passed
03/09/2023 COT - RSEL - Electrical Underground Passed
03/28/2023 COT - RSBU - Exterior Clips/Sheathing Passed
03/28/2023 COT - RSBU - Roof Nailing Passed
04/04/2023 COT - RSPL - Sewer Passed
05/04/2023 COT - RSPL - Yard Water Line Passed
05/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/04/2023 COT - RSPL - Gas Pressure Test Passed
05/04/2023 RSME - Mechanical Progress Passed
05/04/2023 RSEL - Electrical Progress Passed
05/04/2023 RSPL - Plumbing Progress Passed
05/05/2023 RSBU - Building Progress Passed
05/11/2023 COT - RSBU - Interior Shear Bracing Passed
05/31/2023 BULD - Electrical Clearance Passed
08/02/2023 COT - BULD - SWG Clearance Passed Swg clearance for meter only.
08/10/2023 COT - RSME - Mechanical Final Passed Missing anti-tip for stove, thermostat must be 54" oc. above ground
08/10/2023 COT - RSPL - Gas Final Passed
08/10/2023 RSBU - Building Final Passed Missing anti-tip for stove, thermostat must be 54" oc. above ground
08/10/2023 COT - RSPL - Plumbing Final Passed
08/10/2023 COT - RSPL - Backwater Valve Passed
08/10/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
CONS-LE 2-2, 68 3001 CR2_V1_V1.PDF DOCUMENTS VIEW
LE2_2, 68_3001 MODEL MASTER_V1_V1.PDF DOCUMENTS VIEW
LE2_2, 68_3001 SIC-2022-12-06_V1-2022-12-14_V1.PDF DOCUMENTS VIEW
LENNAR LETTERHEAD CLE 68_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW