Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/07/2022
Applicant:
David Martin
Description:
SFR K35W

Permit Reviews

Permit Number - TC-MDP-1222-00072
Permit Status: Complete
Permit Description: SFR K35W
Start Date Submittal Complete Date Status  
10/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/27/2023 REQUIRES RESUBMIT Review Details
01/24/2023 RESIDENTIAL NEW DWELLING v.2 01/26/2023 APPROVED Review Details
10/11/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/13/2023 APPROVED Review Details
12/07/2022 RESIDENTIAL NEW DWELLING v.1 01/05/2023 REQUIRES RESUBMIT Review Details
07/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/17/2023 APPROVED Review Details
10/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 11/02/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1222-00072
Permit Status: Complete
Permit Description: SFR K35W
Date Description Comments
07/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
10/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1222-00072
Permit Description: SFR K35W
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/30/2023 COT - RSPL - Rough Soil Passed okay to backfill. shading required
01/30/2023 COT - RSPL - Sewer Passed okay to backfill. shading required.
01/30/2023 COT - RSPL - Yard Water Line Passed okay to backfill. shading required.
02/02/2023 COT - RSEL - Grounding/Bonding Passed
03/03/2023 COT - RSBU - Roof Nailing Passed
03/03/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/11/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/11/2023 BULD - Electrical Clearance Passed TEP ECO
04/11/2023 COT - RSPL - Gas Pressure Test Passed
05/09/2023 COT - RSBU - Interior Shear Bracing Passed
07/14/2023 RSBU - Building Final Passed
07/14/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/14/2023 RSBU - Building Progress Passed
07/14/2023 COT - RSBU - Preslab Passed
07/14/2023 COT - RSEL - Electrical Final Passed
07/14/2023 COT - RSEL - Electrical Underground Passed
07/14/2023 COT - RSEL - Outdoor Lighting Passed
07/14/2023 COT - RSPL - Gas Final Passed
07/14/2023 COT - RSPL - Plumbing Final Passed
07/14/2023 COT - RSME - Mechanical Final Passed
07/14/2023 COT - BULD - SWG Clearance Passed N/a duplicate inspection. 7/14/2023

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
1_COVER LETTER TRUSS CALCS_V1.PDF DOCUMENTS VIEW
1_TRUSS CALCS K35W_V2.PDF DOCUMENTS VIEW
SPAPP-P22WP00025 FINAL ACCEPTANCE LETTER-2023-10-11_V1.PDF DOCUMENTS VIEW
210841 - WESTBRIDGE AT SILVERBELL LOT 41 - PT REPORT-2023-07-13_V1.PDF DOCUMENTS VIEW
P21SD00048 SEWER DA_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION-2022-12-07_V1-2023-01-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-1_SITEPLAN_V2_V1.PDF DOCUMENTS VIEW