Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
12/07/2022
Applicant:
David Martin
Description:
SFR K35O T21-M0036

Permit Reviews

Permit Number - TC-MDP-1222-00069
Permit Status: Issued
Permit Description: SFR K35O T21-M0036
Start Date Submittal Complete Date Status  
10/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/31/2023 APPROVED Review Details
01/27/2023 RESIDENTIAL NEW DWELLING v.2 02/03/2023 APPROVED Review Details
12/07/2022 RESIDENTIAL NEW DWELLING v.1 12/09/2022 REQUIRES RESUBMIT Review Details
06/30/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2023 APPROVED Review Details
10/31/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/02/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1222-00069
Permit Status: Issued
Permit Description: SFR K35O T21-M0036
Total Outstanding Activity Conditions - 1
Date Name
10/31/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1222-00069
Permit Status: Issued
Permit Description: SFR K35O T21-M0036
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-1222-00069
Permit Description: SFR K35O T21-M0036
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/08/2023 COT - RSPL - Rough Soil Passed underground plumbing is holding water. okay to backfill trenches.
02/08/2023 COT - RSPL - Sewer Passed sewer line is connected okay to backfill.
02/08/2023 COT - RSPL - Yard Water Line Passed water line is holding 60# of air. okay to backfill trenches
02/15/2023 COT - RSEL - Grounding/Bonding Passed
03/09/2023 COT - RSBU - Roof Nailing Passed
03/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/17/2023 COT - RSEL - Electrical Underground Passed
04/17/2023 COT - RSBU - Preslab Passed
04/17/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 4/17/2023
04/17/2023 COT - RSPL - Gas Pressure Test Passed
04/17/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/28/2023 COT - RSBU - Interior Shear Bracing Passed
06/16/2023 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 6/16/2023
06/20/2023 RSBU - Building Progress Passed
06/20/2023 COT - RSEL - Electrical Final Passed
06/20/2023 COT - RSME - Mechanical Final Passed
06/20/2023 ENGR Engineering Final Passed
06/20/2023 COT - RSEL - Outdoor Lighting Passed
06/20/2023 COT - RSPL - Gas Final Passed
06/20/2023 COT - RSPL - Plumbing Final Passed
06/20/2023 RSBU - Building Final Passed

Documents

File Name Document Type  
1_COVER LETTER TRUSS CALCS_V1.PDF DOCUMENTS VIEW
K35O APPROVED TRUSS CALCS (R1) 12-2-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
SPAPP-P22WP00025 FINAL ACCEPTANCE LETTER-2023-10-30_V1.PDF DOCUMENTS VIEW
210841 - WESTBRIDGE AT SILVERBELL LOT 19 - PT REPORT-2023-06-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SPECIAL_INSPECTION (1)-2022-12-07_V1.PDF DOCUMENTS VIEW
CONS-1_SITE PLAN_V2.PDF DOCUMENTS VIEW
LETTER FROM CDRC DATED DECEMBER 23, 2022_V1.PDF DOCUMENTS VIEW