Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/18/2023
Applicant:
David Martin
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-1222-00067
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
05/26/2023 RESIDENTIAL NEW DWELLING v.1 06/05/2023 APPROVED Review Details
10/19/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/23/2023 APPROVED Review Details
11/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/03/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1222-00067
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
05/26/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/26/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/23/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
06/05/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1222-00067
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/27/2023 COT - RSPL - Rough Soil Passed okay to back fill underground plumbing
06/27/2023 COT - RSPL - Sewer Passed
06/27/2023 COT - RSPL - Yard Water Line Passed
07/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/06/2023 COT - RSBU - Preslab Passed
07/06/2023 COT - RSEL - Electrical Underground Passed
07/06/2023 COT - RSEL - Grounding/Bonding Passed
07/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/27/2023 COT - RSBU - Roof Nailing Passed
08/30/2023 BULD - Electrical Clearance Passed
08/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
08/30/2023 COT - RSPL - Gas Pressure Test Passed
09/06/2023 COT - RSBU - Interior Shear Bracing Passed
10/24/2023 COT - BULD - SWG Clearance Passed SWG for meter only
11/03/2023 COT - RSEL - Electrical Final Passed
11/03/2023 COT - RSEL - Outdoor Lighting Passed
11/03/2023 COT - RSME - Mechanical Final Passed
11/03/2023 COT - RSPL - Plumbing Final Passed
11/03/2023 RSBU - Building Final Passed
11/03/2023 RSBU - Building Progress Passed
11/07/2023 ENGR Engineering Final Passed remove nursery stakes from landscaping, remove contractor equipment and backyard drainage stormwater slope can be improved.

Documents

File Name Document Type  
1_COVER LETTER TRUSS CALCS_V1.PDF DOCUMENTS VIEW
K35I APPROVED TRUSS CALCS 10-18-22 - ALLIANCE TRUSS_V1.PDF DOCUMENTS VIEW
210841 - WESTBRIDGE AT SILVERBELL LOT 25 - PT REPORT-2023-10-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-05-18_V1.PDF DOCUMENTS VIEW