Permit: TC-MDP-1222-00064
Permit Details
Apply Date:
12/07/2022
Applicant:
David Martin
Description:
SFR K35D T21-M0032
Permit Reviews
Permit Number - TC-MDP-1222-00064
Permit Status: Issued
Permit Description: SFR K35D T21-M0032
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/27/2023 | RESIDENTIAL NEW DWELLING v.2 | 02/03/2023 | APPROVED |
07/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/18/2023 | APPROVED |
11/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/03/2023 | APPROVED |
12/07/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/09/2022 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-1222-00064
Permit Status: Issued
Permit Description: SFR K35D T21-M0032
Date | Description | Comments |
---|---|---|
11/03/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/03/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/03/2023 | Post-Tension Inspection Report is required. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County | |
11/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-1222-00064
Permit Description: SFR K35D T21-M0032
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2023 | COT - RSPL - Sewer | Passed | sewer connection is good | |
02/08/2023 | COT - RSPL - Yard Water Line | Passed | water lines holding 60#+ of air. okay to backfill trenches. | |
02/08/2023 | COT - RSPL - Rough Soil | Passed | underground plumbing holding water. | |
02/17/2023 | RSBU - Building Progress | Passed | inspections are for rebar/excavation layout and pre slab. okay for concrete slab | |
02/17/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
03/15/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/15/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/13/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 4/13/2023 | |
04/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/13/2023 | COT - RSBU - Preslab | Passed | ||
04/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
05/04/2023 | COT - RSBU - Interior Shear Bracing | Passed | Approved. Corrections have been made. 5/4/2023 | |
06/26/2023 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
07/14/2023 | RSBU - Building Final | Passed | ||
07/14/2023 | COT - RSEL - Electrical Final | Passed | ||
07/14/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/14/2023 | COT - RSME - Mechanical Final | Passed | ||
07/14/2023 | COT - RSPL - Gas Final | Passed | ||
07/14/2023 | COT - RSPL - Plumbing Final | Passed |